<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>DSpace Comunidad :</title>
    <link>http://dspace.unach.edu.ec/handle/51000/12426</link>
    <description />
    <pubDate>Fri, 03 Jul 2026 08:09:31 GMT</pubDate>
    <dc:date>2026-07-03T08:09:31Z</dc:date>
    <item>
      <title>Transferencia tecnológica de Métodos Constructivos avanzados hacia zonas rurales de Chimborazo: con impresión 3D en Hormigón.</title>
      <link>http://dspace.unach.edu.ec/handle/51000/17004</link>
      <description>Título : Transferencia tecnológica de Métodos Constructivos avanzados hacia zonas rurales de Chimborazo: con impresión 3D en Hormigón.
Autor : Samaniego Guerrero, Jhonatan Fabricio
Resumen : Esta investigación analiza la transferencia de tecnología de métodos de construcción avanzados mediante impresión 3D de concreto para abordar el déficit habitacional en las zonas rurales de Chimborazo, donde el 66.5% de la población vive en pobreza. El estudio evalúa la viabilidad de implementar esta tecnología como alternativa a los sistemas tradicionales para la construcción de vivienda social, considerando experiencias internacionales y su adaptación a las condiciones locales. La metodología empleada fue mixta (cualitativa-cuantitativa), incluyendo el análisis de 175 proyectos internacionales registrados en la Base de Datos de Edificios Impresos en 3D (2013-2024), así como un estudio comparativo de costos, tiempos de ejecución y requerimientos de mano de obra. También se evaluaron factores técnicos, económicos y sociales específicos de Chimborazo. Los resultados demuestran una reducción del 56% en los costos (de $6,706 a $2,940 por unidad de vivienda de 42 m²), una disminución del 90% en el tiempo de construcción (de 90 a 9 días) y una reducción del 75% en los requerimientos de mano de obra. El punto de equilibrio se alcanza a partir de 75 viviendas. Se concluye que la transferencia de tecnología es factible mediante el modelo integral “Chimborazo 3D Hub”, que integra innovación y sostenibilidad.
Descripción : This research analyzes the technology transfer of advanced construction methods using 3D concrete printing to address the housing deficit in rural areas of Chimborazo, where 66.5% of the population lives in poverty. The study evaluates the feasibility of implementing this technology as an alternative to traditional systems for social housing construction, considering international experiences and its adaptation to local conditions. The methodology employed was mixed (qualitative-quantitative), including the análisis of 175 international projects&#xD;
registered in the 3D Printed Buildings Database (2013- 2024), as well as a comparative study of costs, execution times, and labor requirements. Specific technical, economic, and social factors for Chimborazo were also evaluated. The results demonstrate a 56% reduction in costs (from $6,706 to $2,940 per 42 m² housing unit), a 90% decrease in construction time (from 90 to 9 days), and a 75% reduction in labor requirements. The break-even point is reached after 75 housing units. It is concluded that technology transfer is feasible through the comprehensive “Chimborazo 3D Hub” model, which integrates innovation and sustainability.</description>
      <pubDate>Fri, 19 Jun 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="false">http://dspace.unach.edu.ec/handle/51000/17004</guid>
      <dc:date>2026-06-19T00:00:00Z</dc:date>
    </item>
    <item>
      <title>Causas frecuentes para retrasos en proyectos de sistemas de riego: Caso de  estudio zonas Andinas de Chimborazo.</title>
      <link>http://dspace.unach.edu.ec/handle/51000/16219</link>
      <description>Título : Causas frecuentes para retrasos en proyectos de sistemas de riego: Caso de  estudio zonas Andinas de Chimborazo.
Autor : Sagñay Anilema, Lucas Adrián
Resumen : Ecuador se divide en región Costa, Sierra y Oriente, destacando la sierra como zona andina por su geografía montañosa y su clima variable, donde la agricultura representa una de las principales actividades económicas. Para garantizar la actividad agrícola en zonas andinas como Chimborazo, Tungurahua, Cotopaxi y Bolívar, es necesario contar lo antes posible con sistemas de riego eficientes, sin embargo, su construcción enfrenta serios desafíos técnicos y administrativos que provocan retrasos, sobrecostos y deficiente calidad de las obras. Este estudio tuvo como objetivo identificar las causas más frecuentes de dichos retrasos, analizar sus efectos e impulsar estrategias de mejora, aplicando una metodología mixta basada en el análisis documental de 38 proyectos de riego culminadas en los últimos 10 años y encuestas a profesionales con experiencia en proyectos de riego en zonas andinas. Los resultados evidenciaron que las principales causas de retrasos en proyectos de riego en zonas andinas se concentran en las etapas tempranas del ciclo de vida del proyecto. Por lo tanto, se propone una estrategia de mejora organizada por etapas del proyecto, alineada al sistema de contratación pública SOCE e integrada con herramientas como el enfoque a la gestión de proyectos según PMBOK y metodología BIM.
Descripción : Ecuador is divided into the Coastal, Highland, and Amazonian regions, with the Highlands standing out as the Andean zone due to its mountainous geography and variable climate, where agriculture is a major economic activity. To guarantee agricultural activity in Andean zones such as Chimborazo, Tungurahua, Cotopaxi, and Bolívar, it is necessary to have efficient irrigation systems as soon as possible. However, their construction faces serious technical and administrative challenges, resulting in delays, cost overruns, and poor-quality work. This study aimed to identify the most frequent causes of these delays, analyze their effects, and propose improvement strategies, applying a mixed-methods approach based on the documentary analysis of 38 irrigation projects completed over the last 10 years and surveys of professionals with experience in irrigation projects in Andean zones. The results showed that the main causes of delays in irrigation projects in Andean zones are concentrated in the early stages of the project life cycle. Therefore, an improvement strategy is proposed, organized by project stages, aligned with the SOCE public procurement system, and integrated with tools such as the project management approach outlined in PMBOK and the BIM methodology.</description>
      <pubDate>Thu, 11 Dec 2025 00:00:00 GMT</pubDate>
      <guid isPermaLink="false">http://dspace.unach.edu.ec/handle/51000/16219</guid>
      <dc:date>2025-12-11T00:00:00Z</dc:date>
    </item>
    <item>
      <title>Análisis de la sostenibilidad económica entre el sistema de recolección de  residuos sólidos puerta a puerta y el de almacenamiento temporal.</title>
      <link>http://dspace.unach.edu.ec/handle/51000/16116</link>
      <description>Título : Análisis de la sostenibilidad económica entre el sistema de recolección de  residuos sólidos puerta a puerta y el de almacenamiento temporal.
Autor : Cárdenas Averos, Reny Jesús
Resumen : EMBARGO DE PUBLICACIÓN.
Descripción : EMBARGO DE PUBLICACIÓN.</description>
      <pubDate>Thu, 27 Nov 2025 00:00:00 GMT</pubDate>
      <guid isPermaLink="false">http://dspace.unach.edu.ec/handle/51000/16116</guid>
      <dc:date>2025-11-27T00:00:00Z</dc:date>
    </item>
    <item>
      <title>Probabilidad de Éxito de Calidad de las Obras versus el Menor Costo en Infraestructura Vial en  la Zona 3.</title>
      <link>http://dspace.unach.edu.ec/handle/51000/16084</link>
      <description>Título : Probabilidad de Éxito de Calidad de las Obras versus el Menor Costo en Infraestructura Vial en  la Zona 3.
Autor : Villa Ramos, Ximena Magali
Resumen : La investigación analizó cómo influye la oferta de menor costo en la calidad de las obras &#xD;
viales ejecutadas en la Zona 3 del Ecuador. En la contratación pública suele adjudicarse al precio más bajo, pero este criterio puede subestimar los costos indirectos y afectar el control y la calidad final del proyecto. &#xD;
El estudio examinó proyectos construidos entre 2021 y 2023, revisando presupuestos, &#xD;
porcentajes de costos indirectos y ensayos de calidad en pavimentos flexibles y articulados. Mediante un análisis estadístico por cuartiles y una evaluación técnica basada en pruebas de campo y laboratorio, se determinó que la probabilidad conjunta de éxito en calidad fue del 0%, debido a que al menos un parámetro no cumplió con la normativa. &#xD;
Al excluir los parámetros con incumplimiento, la probabilidad de éxito alcanzó el 0.087% &#xD;
en obras de adoquinado y el 1.56% en pavimentos flexibles. La correlación entre costos indirectos y calidad fue del 47%, reflejando una relación débil, pero con tendencia creciente. &#xD;
En general, los resultados muestran que las ofertas con costos indirectos reducidos &#xD;
presentan mayor riesgo técnico, por lo que se recomienda revisar los criterios de adjudicación e incorporar evaluaciones que prioricen la calidad y una adecuada planificación.
Descripción : This research examines the influence of low-cost bidding on the quality of road construction projects executed in Zone 3 of Ecuador. In public procurement processes, contracts are frequently awarded to the lowest bid; however, this practice often results in the underestimation of indirect costs, which in turn compromises project control and &#xD;
final construction quality. &#xD;
The study analyzed projects developed between 2021 and 2023, reviewing budget structures, indirect-cost allocations, and quality-control results for flexible and articulated pavements. Using a quartile-based statistical approach and a technical assessment supported by field and laboratory testing, the analysis determined that the joint &#xD;
probability of achieving full compliance with all quality parameters was 0%, as at least one specification failed in every case. &#xD;
When non-compliant parameters were excluded, the probability of success increased to 0.087% for block pavements and 1.56% for flexible pavements. The correlation between indirect-cost levels and quality outcomes was 47%, indicating a weak but positive relationship. &#xD;
Overall, the findings indicate that bids with reduced indirect costs entail greater technical risk. These results underscore the need to revise current award criteria and incorporate evaluation methods that prioritize quality assurance and robust project planning.</description>
      <pubDate>Wed, 26 Nov 2025 00:00:00 GMT</pubDate>
      <guid isPermaLink="false">http://dspace.unach.edu.ec/handle/51000/16084</guid>
      <dc:date>2025-11-26T00:00:00Z</dc:date>
    </item>
  </channel>
</rss>

